Machico, Madeira · construction diary
The site,
month by month
No renders on this page. These are photos and video stills from the building site in Machico, taken by the developer and published as the work moves on. Building started in August 2026; keys are planned for September 2027.
Last update: October 2026
01
Stage one · the ground
August 2026
The plot is cleared and the old wall along the road comes down. The excavator opens the ground for the garage level, the base for the tower crane is cast, and then the crane goes up over the plot.
02
Stage two · foundation and garage level
September 2026
Retaining walls are cast against the slope. The foundation slab is reinforced bar by bar and poured with a concrete pump. On top of it rise the walls of the garage level, and by mid-September the slab over the garage is cast.
03
Stage three · now
October 2026
The garage level is closed. Its outer walls get waterproofing, the openings for the lift and the stairs are formed, and the bars for the first apartment floor are waiting.